Abhainn Achachoish

  • Scheme Size: 95kW
  • Gross Head: 68m
  • Design Flow: 230 l/s
  • Turbine Type: Turgo
  • Pipe: 400mm PE100 (890m)
  • Estimated Generation: 285,000kWH
  • Location: Argyll and Bute
  • Status of Site: The scheme was commissioned in December 2016. Construction started at the beginning of August 2016 and was finished by the beginning of November 2016.