Abhainn Achachoish
- Scheme Size: 95kW
- Gross Head: 68m
- Design Flow: 230 l/s
- Turbine Type: Turgo
- Pipe: 400mm PE100 (890m)
- Estimated Generation: 285,000kWH
- Location: Argyll and Bute
- Status of Site: The scheme was commissioned in December 2016. Construction started at the beginning of August 2016 and was finished by the beginning of November 2016.