Barbeth
- Scheme Size: 100kW
- Gross Head: 105m
- Design Flow: 132 l/s
- Turbine Type: Turgo
- Pipe: 400mm PE100 (1512m)
- Estimated Generation: 364,000kWH
- Location: Dumfries and Galloway
- Status of Site: The scheme was commissioned in August 2016. Construction started at the beginning of April 2016 and was finished by the end of August 2016.