Glenlee

  • Scheme Size: 100kW
  • Gross Head: 72m
  • Design Flow: 223 l/s
  • Turbine Type: Turgo
  • Pipe: 400mm PE100 (1568m)
  • Estimated Generation: 390,000kWH
  • Location: Dumfries and Galloway
  • Status of Site: The scheme was commissioned in February 2015. Construction started at the beginning of September 2015 and was fnished by the end of January 2016.