Glenlee
- Scheme Size: 100kW
- Gross Head: 72m
- Design Flow: 223 l/s
- Turbine Type: Turgo
- Pipe: 400mm PE100 (1568m)
- Estimated Generation: 390,000kWH
- Location: Dumfries and Galloway
- Status of Site: The scheme was commissioned in February 2015. Construction started at the beginning of September 2015 and was fnished by the end of January 2016.