Mollin
- Scheme Size: 60kW
- Gross Head: 94m
- Design Flow: 105 l/s
- Turbine Type: Turgo
- Pipe: 315mm PE100 (1420m)
- Estimated Generation: 225,000kWH
- Location: Dumfries and Galloway
- Status of Site: The scheme was commissioned in October 2014. Construction started at the beginning of May 2014 and way finished by the beginning of November 2014.