← Case Studies

Mollin

  • Scheme Size: 60kW
  • Gross Head: 94m
  • Design Flow: 105 l/s
  • Turbine Type: Turgo
  • Pipe: 315mm PE100 (1420m)
  • Estimated Generation: 225,000kWH
  • Location: Dumfries and Galloway
  • Status of Site: The scheme was commissioned in October 2014. Construction started at the beginning of May 2014 and way finished by the beginning of November 2014.